It is not until much later that the performance of a lift-station can be assessed. Flow calculations, site elevations systems pressure and wastewater characteristics, peak conditions, maintenance access, controls, and capacity in the future all impact the type of structure that will eventually be built.

Image credit: romtecutilities.com
For project owners comparing the best lift station designers, the more useful question isn’t simply who can specify pumps. It’s not about who is able to specify pumps and who can translate the site conditions and operational requirements into a system that’s feasible to construct and maintain.
Gravity has Limits
Gravity is typically the most efficient way to convey wastewater, but terrain and development patterns aren’t always in sync. The new residential, commercial and industrial areas are usually too high or far from the existing gravity sewer system.
Lift stations provide the mechanical force needed for the movement of wastewater to the next stage of the system of collection. However, the design process requires a thorough understanding of the normal operating conditions as well as less convenient circumstances like a high flow, maintenance of pumps, equipment malfunctions or upcoming increases in demand.
The most reputable companies for wastewater design must analyze the whole problem, instead of just focusing on the station.
Existing infrastructure can complicate the puzzle
The problem is not the new construction. In addition to maintaining the essential infrastructure for wastewater, municipalities often need to replace or upgrade aging stations.
Forcemains, wetwells and other existing components electrical controls and services boundaries, site boundary, and downstream Infrastructure can restrict the new design. Engineers must determine what can be left, what requires replacement and how the new components are to be incorporated into the current system.
Romtec Utilities offers pumping solutions for municipal, private, industrial, commercial and retrofit applications. Pumping systems can be designed to meet the unique requirements of each project.
Stormwater Has Different Rules
The most efficient stormwater system designers need to use the search terms to solve any hydrologic issue. Stormwater systems may experience drastic changes in volume based on rainfall, drainage capacity and the discharge rate allowed.
For instance, a facility which serves as a detention zone might require a temporary hold of the runoff and then pump it out at a controlled rate. Engineers should consider the flow, head conditions, the requirements for environmental protection, flood-management goals and the specifics of the drainage system that is receiving.
Prefabrication is a way to move work from the site of work
Field assembly is a complicated process that could result in scheduling conflicts, mistakes, delays, and change orders. Romtec Utilities uses substantial prefabrication before equipment reaches the site of the project.
The process of completing more assembly and quality control work in a controlled area will reduce the amount of construction that is required on the field. Based on the Romtec project approach, certain installations that otherwise would take weeks could be completed in just a few days, depending on the requirements of the project.
The process of commissioning is Key to Engineering Success
It’s not enough to put in all the parts to a system to be considered a proven one. Romtec Utilities provides installation advisors and then follows the construction process by providing startup controls, check-points on the control panel and pump operation checks, system testing, and staff training. Documentation also gives operators information that they can use to maintain the system or contemplating future expansion.
People who want to find the best designers of lift stations must pay attention to this final step. Engineering that is of high quality should yield more than just a satisfactory set of drawings. The station owner must be able to operate a well-functioning system, skilled staff, efficient documentation and equipment that is designed to meet the demands that the station will face in daily operation.